Works completed:
If you are not happy with the layout of your bathroom the 1st thing to investigate is: can the drainage be altered? Sometimes there is more to consider than just the drainage, as was the case with ______________ The entry door to this bathroom (before the renovation) was positioned at the left end of the room. It was difficult to achieve the layout that the clients were after with the door in this position. By shifting the position of the door to the centre we were able to fit the bath with shower under the window, the WC on the left behind the door so not visible & the vanity / saving cabinet on the right.
Project scope:
- Move entrance door to middle of the bathroom.
- Move drainage to suit new layout.
- New electrics & painting services.