Works completed:
- Demolish the existing bathroom
- Delete wall under staircase to gain space for bathtub
- Build bath structure with seat along the shower area
- Supply and install strip led lighting
- Waterproofing & tiling floor to ceiling tiling
- New fixtures throughout both bathrooms
- Painting throughout bathroom