Works completed:
Beau Reno design was responsible for giving this 2-bedroom apartment a new look & lease of life. The bathroom fixtures were relocated via building a hob-wall to hide drainage pipes. The laundry was redesigned to the clients’ requirements with new joinery & doors. New engineered floorboards were installed throughout to replace the carpet which completely gave the apartment a new fresh feel. The kitchen was also given an upgrade by painting the kitchen fronts, new appliances & new stone benchtop & splash back.
Project scope:
- New re-designed bathroom with new electrics & new smart toilet.
- Remodeled laundry with new joinery.
- Engineered floorboards throughout on top of acoustic underlay.
- Painting of kitchen fronts.
- New stone benchtop & splash back.
- New light fittings & change light switches & gpo covers.
- Painting throughout.